Internal engineering log

Engineering log (internal voice)

This is the project's raw day-by-day engineering notebook, published for traceability. Entries use internal task IDs and optical-design shorthand, and are not edited for outside readers. For the reviewer-facing state of the project, start at the overview or the evidence summary.

Recent work

Daily entries generated from the project diary.

2026-07-13 - EmberScope daily work

Added the 13-field trace pattern and measured flat-sensor acceptance quantities needed for survey optimization.

Permalink

2026-07-12 - EmberScope daily work

Parameterized the prescription optimizer for the legacy spotter and two survey-scale optical targets without changing the committed design.

Permalink

2026-07-06 - EmberScope daily work

Added the COTS-versus-custom optics regime finding for RFS-041 and kept it visible through the diary feed.

Permalink

2026-07-05 - EmberScope daily work

Replaced the deprecated radiometry integration call and re-ran the gates; requirements defaults recorded by Greg in the interactive session.

Permalink

2026-07-04 - EmberScope daily work

Added the RFS-019 source-evidence readiness gate before trace execution.

Permalink

2026-07-03 - EmberScope daily work

Published source-note record contract for RFS-011 evidence intake.

Permalink

2026-07-02 - EmberScope daily work

Published source-evidence intake checklist for trace execution.

Permalink

2026-07-01 - EmberScope daily work

Published explicit validator rules for future trace-acceptance evidence.

Permalink

2026-06-30 - EmberScope daily work

Published trace-acceptance artifact contract for the survey-prescription restart.

Permalink

2026-06-29 - EmberScope daily work

Published trace-run status for the survey-prescription restart.

Permalink

2026-06-28 - EmberScope daily work

Published numeric trace packet for the survey-prescription restart.

Permalink

2026-06-27 - EmberScope daily work

Added deterministic samples for first optics trace.

Permalink

2026-06-26 - EmberScope daily work

Added measured pass/fallback gates for the optics restart trace.

Permalink

2026-06-25 - EmberScope daily work

Added pre-trace feasibility gates for optics restart.

Permalink

2026-06-24 - EmberScope daily work

Added optimizer-ready optics restart bundle.

Permalink

2026-06-22 - EmberScope daily work

Added an evidence intake ledger for RFS-011 closeout.

Permalink

2026-06-21 - EmberScope daily work

Added a scorecard for comparing returned COTS quotes.

Permalink

2026-06-20 - EmberScope daily work

Converted the COTS branch into a quote-ready evidence packet.

Permalink

2026-06-19 - EmberScope daily work

Mapped RFS-011 answer patterns to closeout and next-action readiness.

Permalink

2026-06-18 - EmberScope daily work

Turned RFS-011 closeout asks into a stakeholder answer pack.

Permalink

2026-06-17 - EmberScope daily work

Separated locked requirements from remaining RFS stakeholder asks.

Permalink

2026-06-16 - EmberScope daily work

Added a COTS payload screen for the RFS-011 fleet decision.

Permalink

2026-06-15 - EmberScope daily work

Added a coverage-area sizing grid for the RFS-011 mission decision.

Permalink

2026-06-14 - EmberScope daily work

Built the F-number / aperture trade study that resolves the binding open item on the four-mirror prescription, adding the NETD~F#^2 and PSF energy-concentration physics the committed radiometry model omitted; the headline finding is that the F/5 worry is regime-dependent and the committed 200 mm plate scale is a spotter, not a survey camera.

Permalink

2026-06-13 - EmberScope daily work

Found and fixed two ray-tracer math errors (conic sag-gradient factor, OPD reference surface) via new analytic regression tests; re-evaluated the design of record and all multi-mirror screening artifacts; overhauled project hygiene (uv migration, ruff/mypy, CI test workflow).

Permalink

2026-06-11 - EmberScope daily work

Added the RFS-028 beam-obstruction gate to the multi-mirror checkpoint; reworked the public site for reviewer clarity; exported geometry artifacts and renders for the optimized prescription.

Permalink

2026-06-10 - EmberScope daily work

Published mission-survey storyboard handoff; first unobscured optimized four-mirror prescription.

Permalink

2026-06-09 - EmberScope daily work

Published bounded curvature-step evidence for multi-mirror branches.

Permalink

2026-06-08 - EmberScope daily work

Published first-pass focus and clearance sweep for multi-mirror branches.

Permalink

2026-06-07 - EmberScope daily work

Published RFS-028 tolerance and clearance evidence.

Permalink

2026-06-06 - EmberScope daily work

Seven-mirror relay branch published for the multi-mirror optical trade.

Permalink

2026-06-05 - EmberScope daily work

Six-mirror dual-triplet branch published for the multi-mirror optical trade.

Permalink

2026-06-04 - EmberScope daily work

Five-mirror reimaging branch published for the multi-mirror optical trade.

Permalink

2026-06-03 - EmberScope daily work

First measured four-mirror branch published for the multi-mirror optical trade.

Permalink

2026-06-02 - EmberScope daily work

RFS-009 fire-radiometry synthesis shipped, and diary/RSS publication infrastructure was added for future automation runs.

Permalink