RFS-011 quote comparison - 2026-06-21
Score vendor quotes before treating COTS as a requirements answer.
The quote packet says what to ask. This comparison register defines hard stops, weighted scoring, and decision rules for the returned evidence.
Purpose
RFS-011 should close on scored evidence, not on a vendor name.
The register preserves the 20 June quote order but adds explicit gates for raw data, calibration metadata, model match, payload integration, budget, and sample evidence.
Scorecard
Hard stops protect the validation path.
| Gate | Weight | Hard stop | Quote field | Pass evidence | Fail signal |
|---|---|---|---|---|---|
| Exact configuration named | 15 | Yes | product, detector core, lens, firmware, included payload components | The quote names the exact sellable configuration and included integration hardware. | Datasheet family names or substituted lens options cannot close RFS-011. |
| Raw or radiometric data path | 20 | Yes | raw/pre-AGC frame export, bit depth, API/SDK, file format, metadata sidecar | The vendor confirms replayable raw or radiometric frames, not only display video. | Post-AGC video, closed cloud export, or screenshots reject the payload as the primary branch. |
| Calibration metadata preserved | 15 | Yes | NUC state, calibration coefficients, shutter/reference behavior, timestamp/geotag metadata | Frames can be replayed with detector state and calibration context. | No calibration state means false-positive and radiometry evidence cannot be audited. |
| Model geometry match | 15 | No | HFOV/VFOV, EFL or focal length, F-number, frame rate, focus setting | The quoted row can be rerun against the existing 3 cm target and coverage model. | Different optics or slow frame timing require a new screen before selection. |
| Payload integration fit | 10 | No | mass, power, envelope, mount, thermal behavior, weathering, airframe lock-in | The product fits the accepted 150 mm / 2 kg / fixed-wing payload basis. | Integration overrun reopens the airframe or payload-envelope assumption. |
| Budget ceiling fit | 15 | No | unit price at required payload count, SDK/license cost, spares, calibration service, lead time | The unit price fits the selected target-area ceiling without hiding support costs. | An over-ceiling quote becomes budget-replan evidence, not a requirements closeout. |
| Sample evidence supplied | 10 | Yes | sample frame, metadata sidecar, reference frame, no-fire rural scene, warm target example | A small evidence bundle can enter the validation pipeline before purchase. | No sample evidence leaves the project with a procurement claim rather than testable data. |
Candidate register
Use the quote ceiling that matches the selected target area.
| Priority | Candidate | Model row | 500 ha ceiling | 1000 ha ceiling | Register action |
|---|---|---|---|---|---|
| 1 | ICI 8640 P, 25 mm lens class Closest COTS-adjacent match to the custom wide-field reference while keeping strong raw output. | 24.8 deg / F/1.0 181 ha/h, 375.4 1px SNR, Quote as COTS candidate | 3 payloads / USD 22k | 6 payloads / USD 11k | Score the returned quote against hard stops before choosing COTS-first, parallel, budget replan, or reject-primary. |
| 2 | Hadron 640R fixed module Fast integrated 640-class module that may reduce integration effort if raw export is usable. | 32.0 deg / F/1.0 236 ha/h, 166.1 1px SNR, Conditional quote gate | 3 payloads / USD 22k | 5 payloads / USD 13k | Score the returned quote against hard stops before choosing COTS-first, parallel, budget replan, or reject-primary. |
| 3 | 45 deg 640-class radiometric camera Representative 45 degree 640-class drone-camera path with strong first-order SNR margin. | 45.0 deg / F/1.0 341 ha/h, 105.8 1px SNR, Physics pass, product gate open | 2 payloads / USD 33k | 3 payloads / USD 22k | Score the returned quote against hard stops before choosing COTS-first, parallel, budget replan, or reject-primary. |
| 4 | 69 deg 640-class mapping camera Largest first-order coverage option, useful if RFS prioritizes single-payload coverage. | 69.0 deg / F/1.0 565 ha/h, 38.4 1px SNR, Physics pass, product gate open | 1 payload / USD 66k | 2 payloads / USD 33k | Score the returned quote against hard stops before choosing COTS-first, parallel, budget replan, or reject-primary. |
| 5 | ICI 8640 P, 35 mm lens class Focused-zone COTS-adjacent option that may be useful for a smaller first trial. | 17.6 deg / F/1.0 127 ha/h, 757.2 1px SNR, Quote as COTS candidate | 4 payloads / USD 16k | 8 payloads / USD 8k | Score the returned quote against hard stops before choosing COTS-first, parallel, budget replan, or reject-primary. |
Decision rules
The score controls the next project move.
COTS-first pass
All hard-stop gates pass, weighted score is at least 85, and unit cost fits the selected target-area ceiling.
RFS-011 can be closeable with recorded stakeholder sign-off and the quote evidence path.
Parallel COTS/custom path
All hard-stop gates pass, but score is 70-84 or price/lead-time risk needs a custom fallback.
Run the COTS evidence branch and custom prescription maturation in parallel.
Budget or mission replan
Data gates pass, but the quote exceeds the target-area unit-cost ceiling or payload-count basis.
Record the quote as evidence for a smaller target area, larger budget, or altitude/airframe change.
Reject as primary payload
Any hard-stop gate fails, especially raw data, calibration metadata, or sample evidence.
Do not buy the product as the RFS primary payload; use it only as integration-risk evidence.
Meeting record
Record the evidence path beside the score.
Do not mark RFS-011 complete until a selected row has quote evidence, hard-stop results, weighted score, stakeholder sign-off, and source note.
- vendor and reseller contact
- exact product, detector core, lens, and firmware/configuration
- target-area basis used for the unit-cost ceiling
- raw/radiometric frame export evidence
- calibration metadata and NUC-state evidence
- sample frame bundle path
- all-up mass, power, and envelope
- unit cost at required payload count plus SDK, spares, and service costs
- lead time, export limits, warranty, and support terms
- reviewer score, decision rule, stakeholder name, date, and source note